All customer cases

Chemical & Coatings

AkzoNobel

Explosion-Proof Paint Bucket Handling

A pneumatic, explosion-proof lifting system moves one or two paint buckets from the filling line to the stacking area.

AkzoNobel operator lifting two paint buckets with a vacuum tube lifter

Project background

Filled paint buckets needed to move from the filling line to stacking and shipping in a paint plant with flammable solvent vapors.

Workpiece

25 kg filled paint buckets; single-bucket or two-bucket lifts up to 50 kg

Solution configuration

A compressed-air-powered, explosion-proof system uses a double suction head to lift one 25 kg bucket or two buckets together.

  • Double suction head system handles one 25 kg bucket or two buckets totaling 50 kg.
  • Compressed-air-powered explosion-proof design; the project record identifies the site marking as ATEX Ex II 2 GD cb B (T6).
  • Explosion-proof rail system with lower support for the flammable-vapor environment.

Application highlights

  • Explosion-proof construction addresses solvent-vapor conditions in paint production.
  • Dual-mode suction heads move two buckets per lift when the workflow requires it.
  • Compressed-air power avoids electrical ignition sources in the lifting system.

Customer value

Supports safe operation in the specified hazardous environment and higher filling-line throughput through two-bucket lifts.

Source: HEROLIFT customer application project record.

Project gallery

On-site images from the AkzoNobel project.

AkzoNobel handling installation — project view 1
AkzoNobel · Project view 1

Need a similar handling solution?

Share your load, site layout, and target workflow. HEROLIFT can recommend a practical configuration.

Contact HEROLIFT